Solution Description
Item Description
one) European standard:
a) V-belt pulleys for taper bushings: SPZ, SPA, SPB, SPC up to 10 grooves
b) Adjustable speed V-belt pulleys and variable speed pulleys
c) Flat belt pulleys and conveyor belt pulleys
2) American standard:
a) Sheaves for taper bushings: 3V, 5V, 8V
b) Sheaves for QD bushings: 3V, 5V, 8V
c) Sheaves for split taper bushings: 3V, 5V, 8V
d) Sheaves for 3L, 4L or A, and 5L or B belts: AK, AKH,2AK, 2AKH, BK, BKH,2BK, 2BKH, 3BK
e) Adjustable sheaves: poly V-pulley, multi-pitch H, L, J, K and M
Parts can be made according to drawings and/or samples, OEM service is welcomed.
3) Bore type: pilot bore, finished bore, taper bore, bore for QD bushing.
four) Surface finish: paint, phosphating, zinc plated.
5) Material: cast iron, ductile iron, steel, nylon, aluminum.
6) Made according to drawings and/or samples, OEM inquiries welcomed.
Thorough Pictures
Product Parameters
Packaging & Transport
Bundle | Regular ideal package deal / Pallet or container. Polybag inside of export carton outside the house, blister and Tape and reel package offered. If customers have particular demands for the packaging, we will gladly accommodate. |
Shipping and delivery |
10-20working times ofter payment receipt comfirmed (based mostly on actual quantity). Skilled goods shipping forward. |
Company Profile
FAQ
Q: Are you manufacturer or buying and selling firm?
A: We are manufacturing facility.
Q: How extended is your shipping and delivery time?
A: Usually it is 5-10 days if the merchandise are in stock. or it is fifteen-20 times if the goods are not in inventory, it is in accordance to amount.
Q: Do you supply samples ? is it totally free or additional ?
A: Yes, we could provide the sample for free demand but do not shell out the cost of freight.
Q: What is your terms of payment ?
A: Payment=1000USD, 30% T/T in progress ,harmony before shippment.
We warmly welcome pals from domestic and overseas arrive to us for company negotiation and cooperation for mutual advantage. To source consumers superb good quality goods with excellent value and punctual delivery time is our obligation.
US $1.3-25.4 / Piece | |
1 Piece (Min. Order) |
###
Certification: | CE, ISO |
---|---|
Material: | Cast Iron |
Surface Treatment: | Phosphated |
Application: | Chemical Industry, Grain Transport, Mining Transport, Power Plant |
Bore Type: | Taper Bore, Pilot Bore |
Groove Number: | 1 – 12 |
###
Samples: |
US$ 0/Piece
1 Piece(Min.Order) |
---|
###
Customization: |
Available
|
---|
###
Package | Standard suitable package / Pallet or container. Polybag inside export carton outside, blister and Tape and reel package available. If customers have specific requirements for the packaging, we will gladly accommodate. |
Shipping |
10-20working days ofter payment receipt comfirmed (based on actual quantity). Professional goods shipping forward. |
US $1.3-25.4 / Piece | |
1 Piece (Min. Order) |
###
Certification: | CE, ISO |
---|---|
Material: | Cast Iron |
Surface Treatment: | Phosphated |
Application: | Chemical Industry, Grain Transport, Mining Transport, Power Plant |
Bore Type: | Taper Bore, Pilot Bore |
Groove Number: | 1 – 12 |
###
Samples: |
US$ 0/Piece
1 Piece(Min.Order) |
---|
###
Customization: |
Available
|
---|
###
Package | Standard suitable package / Pallet or container. Polybag inside export carton outside, blister and Tape and reel package available. If customers have specific requirements for the packaging, we will gladly accommodate. |
Shipping |
10-20working days ofter payment receipt comfirmed (based on actual quantity). Professional goods shipping forward. |
bronze bushing
editor by czh 2022-12-15